+Catering and cooks were fine, and the crewing agency behind the fleet does its part well.
−Four to five bunkering operations in five days with full mooring evolutions leaves no real sleep, there is no gas engineer so the work floats between nobody and the ETO, supply approaches zero, and any spares request triggers an angry cost lecture.
The vessels are built cheap and worked hard. This is not an FSRU sitting on a jetty: every bunkering means berthing and unberthing, and in busy stretches we ran four or five operations in five days — sleep became theoretical. The gas engineer position does not exist, so that work lands on the electrician or nowhere. Supply is nearly zero and requests are met with lectures about cost; during my time the captain was removed and the chief engineer prayed his way to the end of contract. As a rung from LPG upward or for a promotion it can serve; for someone with deep-sea LNG experience it would feel like a downgrade that other owners may also read as one.